Contracts for Routine Maintenance of Main Roads in FBH
On August 24, 2018, PC Roads of the FBH awarded contracts for routine maintenance of 2,072.67 km of main roads in the territory of the Federation of BH in the total value of BAM 26.820.445, 58 including VAT.
Director of PC Roads of FBH, Mr. FBH Ljubo Pravdic has signed the following contracts with companies that, in addition to fulfilling the bidding conditions, submitted the lowest evaluated bids:
- LOT 1, Una-Sana Canton, main roads M-5; M-11; M-14; M-14.2 and M-15, total length 207,73 km, Contractor: Rad putevi Bihać, Contract Amount: BAM 2.396.926,54;
- LOT 2, Una Sana Canton, main roads M-4.2; M-14; M-14.2, total length 141,52 km, Contractor: Kov-grad Bužim, Contract Amount: BAM 1.990.988,43;
- LOT 3, Tuzla Canton, main roads M-1.8; M-1.9; M-4; M-14.1; M-18 and M-19.2 , total length 236,92 km, Contractor: JV Jata group Srebrenik and HIH Živinice, Contract Amount: BAM 3.905.910,60;
- LOT 4, Zenica-Doboj Canton, main roads M-4; M-5 and M-17, total length 139,44 km, Contractor: Dobojputevi Doboj South, Contract Amount: BAM 2.059.433,85;
- LOT 5, Central Bosnia Canton, main roads M-5; M-16, total length 131,68 km, Contractor: Rudnici gipsa Donji Vakuf, Contract Amount: BAM 2.099.727,08;
- LOT 6, Bosnian Podrinje Canton, main roads M-5; M-18; M-18.1; M-20; total length 93,34 km, Contractor: Goraždeputevi Goražde, Contract Amount: BAM 1.261.981,64;
- LOT 8, Sarajevo Canton, main roads M-5; M-17; M-18 , total length 129,86 km, Contractor: „Sarajevoputevi“ d.d. Sarajevo, Contract Amount: BAM 2.289.577,12;
- LOT 9, Posavina Canton, main roads M-1.8, M-14.1 i M-14.2 , total length 64,13 km, Contractor: Ceste d.d. Mostar, Contract Amount: BAM 201.439,61;
- LOT 10, Central Bosnia Canton, main roads M-5; M-16.2; M-16.4, total length 136,12 km, Contractor: Ceste d.d. Mostar, Contract Amount: BAM 1.788.680,33;
- LOT 11, Canton 10, main roads M-6.1; M-14.2; M-15; M-16; M-16.3, total length 346,55 km, Contractor: Ceste d.d. Mostar, Contract Amount: BAM 5.356.829,03;
- LOT 12, Herzegovina Neretva and West Herzegovina Canton, main roads M-2; M-6; M-6.1; M-17; M-17.3; M-17.4 and M-20, total length 318,86 km, Contractor: Ceste d.d. Mostar, Contract Amount: BAM 3.468.951,35;
The contracts shall remain valid from September 1, 2017 until August 31, 2018. The above contract amounts are inclusive of VAT.