Main Road Maintenence

LOT 1, Una – Sana Canton, main roads:

  • M5 (Croatian border) Izačić  -Bihać - Bosanski Petrovac – Ključ - (BBE), L=112,245 km;
  • M5 Bihać Bypass, L= 2,871 km;
  • M11 Ripač - Užljebić (CB), L= 8,526 km;
  • M14.2 Bosanski Petrovac - Drvar, l= 26,337 km;
  • M15 Prijedor (BBE) Sanski Most – Vrhpolje - Ključ, L= 43,729 km (gravel road L= 16,358 km);
  • M15 Kamičak - Gornji Kamičak, L= 5,601 km,

LOT 1 total length: 199,309 km, 
Contractor: JV „Rad putevi“ Bihać, „Behić Sanny Boy“ Bihać, „Divel“ Sanski Most, Address: M.Š. Kurtćehajića bb, 77 000 Bihać, phone: +387 37 351 325;

LOT 2, Una – Sana Canton, main roads:

  • M4.2 (CB) Maljevac – Cazin - Srbljani, L= 49,681 km;
  • M4.2 Velika Kladuša Bypass, L= 1,883 km;
  • M14 Bihać - Bosanska Krupa - Bosanski Novi (BBE), L= 49,237 km;
  • M14a road under construction Čavkići - Spahići, L= 12,066 km;
  • M14.2 Bosanska Krupa – Krnjeuša - Bosanski Petrovac, L= 53,674 km;

LOT 2 total length: 166,541 km, 
Contract: JV „Kov-grad“ Bužim, „I-Selimović“ Cazin, Address: Mrazovac 326, 77 245 Bužim, phone: +387 37 423-320;

LOT 3, Tuzala Canton, main roads:

  • M1.8 (BBE) Arizona - (District border) and (DB) – Srebrenik - Šićki Brod, L= 40,849 km;
  • M1.9 Šamac (BBE) – Gradačac - Ormanica, L= 19,846 km;
  • M4 Donja Orahovica - Šićki Brod – Tuzla - Simin Han – Kalesija – Memići (BBE), L= 71,881 km;
  • M14.1 Modriča (BBE) – Gradačac – Pelagićevo (BBE), L= 13,817 km;
  • M18 Banj Brdo (BBE) - Simin Han, L= 16,082 km;
  • M18 Šićki Brod – Živinice – Kladanj - Olovo, L= 65,921 km
  • M18 Karaula Tunnel + Alignment, L= 2,377 km;
  • M19.2 Vitalj – Vlasenica (BBE), L= 11,780 km;

LOT 3 total length: 242,553 km, 
Contractor: JV „Jata group“ Srebrenik and „HIH“ Živinice, Address: Potpeć bb, 75 350 Srebrenik, phone: +387 35 651 498;

LOT 4, Zenica – Doboj Canton, main roads:

  • M4 Teslić (BBE) - Karuše, L= 16,418 km;
  • M4 Doboj (BBE) – Gračanica - Donja Orahovica, L= 22,276 km;
  • M5 Kaonik - Lašvanska petlja, L= 5.217 km;
  • M17 Doboj (BBE) Maglaj – Žepče – Zenica - Bilješevo, L= 97,081 km;

LOT 4 total length: 140,991 km, 
Contactor: „Dobojputevi“ Doboj Jug, Address: Usorska 130, 74 203 Matuzići, phone: +387 32 691 474;

LOT 5a, Central Bosnia Canton, main roads:  

  • M5 Rogolji (BBE) – Jajce - Donji Vakuf (until the km 18+781), L= 28,181 km;
  • M16 Crna Rijeka (BBE) - Jajce, L= 19,024 km;
  • M16 Donji Vakuf – Bugojno - Kupres (tunnel), L= 31,795 km

LOT 5a total length: 79,04 km;
Contractor: „Dobojputevi“ Doboj Jug, (Contract deadline 15 March 2020), Address: Usorska 130, 74 203 Matuzići, phone: +387 32 691 474;

LOT 5b, Central Bosnia Canton, main roads: 

  • M5 Jajce (from the km 18+781) - Donji Vakuf – Travnik - Nević Polje, L= 53,742 km;

LOT 5b total length: 53,742 km;
Contractor: JV „Jata group“ Srebrenik and „HIH“ Živinice (Contract deadline 15 March 2020), Address: Potpeć bb, 75 350 Srebrenik, phone: +387 35 651 498;

LOT 6, Bosnian Podrinje Canton, main roads:

  • M5 Podgrab (BBE) – Prača – Hrenovica - (BBE), L= 13,998 km (gravel road, L= 5,8 km);
  • M18 Bogatići (BBE) – Trnovo (BBE), L= 5,934 km;
  • M18.1 Ustikolina – Grebak – Delijaš - Trnovo, L= 46,334 km;
  • M20 Foča (BBE) – Ustikolina – Goražde - (BBE), L= 27,040 km;
  • M20 Goražde Bypass, L= 1,885 km;

LOT 6 total length: 95,191 km, 
Contarctor: „Goraždeputevi“ Goražde, Address: 22 maja bb, 73 102 Goražde, phone: +387 38 221 147;

LOT 7, Herzegovina – Neretva Canton, main roads:

  • M6.1 Široki Brijeg - Mostar, L= 4,365 km;
  • M6.1 Gnojnice – Nevesinje (BBE), L= 21,844 km;
  • M16.2 Prozor - Jablanica, L= 30,147 km;
  • M17 Konjic – Jablanica – Mostar - Gnojnice, L= 72,481 km;

LOT 7 total length: 128,837 km, 
Contractor: JV „HP Investing“ Mostar, „Hercegovinaputevi“ Trebinje, Address: Bišće Polje bb, 88 000 Mostar, phone: +387 36 577 024;

LOT 8, Sarajevo Canton, main roads:

  • M5; Azize Šaćirbegović (roundabout) – Korija – Ljubogošta (BBE), L= 8,054 km;
  • M5 Šeherćehajin most - Korija, L= 1,759 km;
  • M5 Gromiljak (at the 16+000) – Mostar Crossroads, L= 8,734 km;
  • M17 Jošanica – Stup Interchange, L= 8,895 km;
  • M17 Stup Interchange, L= 1,759 km;
  • M17 Ilidža – Blažuj (pak centar), L= 4,30km;
  • M17 Mostar Crossroads –Tarčin - Konjic, L= 43,107 km;
  • M18 Olovo – Semizovac - Koševsko Brdo, L= 50,711 km;
  • M18 Stup Interchange – Trnovo (BBE); L= 3,50 km;

LOT 8 total length: 130,617 km, 
Contractor: „Sarajevoputevi“ d.d. Sarajevo, Address: Mustajbega Fadilpašića 17, 71 000 Sarajevo, phone: +387 33 667 499;

LOT 9, Posavina Canton, main roads;

  • M1.8 (CB) – Orašje – Lepnica (BBE), L= 7,992 km;
  • M14.1 Brod (BBE) – Odžak - Vukosavlje (BBE), L= 24,670 km;
  • M14.2 Odžak – Prud - Šamac(BBE), L= 14,884 km;
  • M14.2 Šamac (BBE) – Domaljevac - Orašje, L= 16,966 km;

LOT 9 total length: 64,512 km, 
Contractor: „Ceste“ d.d. Mostar, TI Orašje, Address: Filipovići 51, 76 277 Bok, Orašje, phone: +387 31 773 101

LOT 10, Central Bosnia Canton, main roads:

  • M5 Nević Polje – Kaonik – Kiseljak – Blažuj (until the km 16+000), L= 58,0 km;
  • M16.2 Bugojno - Gornji Vakuf (Uskoplje) - Prozor, L= 39,60 km;
  • M16.4 Bugojno - Novi Travnik - Nević Polje, L= 38,618 km;

LOT 10 total length: 136,385 km,
Contractor: „Ceste“ d.d. Mostar, TI Kiseljak, Address: Josipa Bana Jelačića bb, 71 250 Kiseljak, phone: +387 30 879 754;

LOT 11, Canton 10, main roads:

  • M6.1 (CB) Kaldrma - Bosansko Grahovo – Livno – Kolo - Studena Vrila, L= 158,647 km;
  • M14.2 Drvar - Resanovci, L= 15,725 km;
  • M14.2 Bosansko Grahovo - Strmica (CB), L= 17,630 km;
  • M15 Mliništa (BBE) – Glamoč - Priluka, L= 52,511 km;
  • M15 Livno – Šujica - Kolo, L= 44,298 km;
  • M16 Bugojno (tunnel) – Kupres - Šujica, L= 23,962 km;
  • M16 Livno – Renjići - Kamensko (CB), L= 32,816 km;
  • M16.3 Renjići – Prisika (CB), L= 3,21 km;

LOT 11 total length: 348,799 km,
Contractor: „Ceste“ d.d. Mostar, TI Livno, Address: Begovača bb, 80 101 Livno, phone: +387 34 242 483;

LOT 12, Herzegovina – Neretva Canton and West Herzegovina Canton, main roads:

  • M2 (CB) Klek – Neum - (CB), L= 90258 km;
  • M6 (CB) Gorica – Grude – Čapljina – Stolac – Ljubinje (BBE), L= 86,449 km;
  • M6.1 Studena Vrila – Posušje - Široki Brijeg - Mostar, L=: 63,954 km;
  • M15 Posušje – Kutleše (CB), L= 3,111 km;
  • M17 Gnojnice – Čapljina – Doljani (CB), L= 38,582 km;
  • M17.3 Buna - Masline, L=19,12 km;
  • M17.3 Stolac – Hutovo - Neum, L= 52,947 km;
  • M17.3 Stari Neum - Babin Do – Link to M17.3, L= 9,009 km;
  • M17.4 Mostar – Čitluk – Ljubuški - Crveni Grm (CB), L= 41,807 km;
    M20, (CB) Ivanjica – Duži (BBE), L= 8,49 km;

LOT 12 total length: 332,727 km,
Contractor: „Ceste“ d.d. Mostar,

  • TI Mostar, Address: Bišće Polje bb, 88 000 Mostar, phone: +387 36 351 248;
  • TI Grude, Address: Cerov Dolac bb 88 347 Ružići, Grude, phone: +387 39 674 401

LOT 13, Herzegovina – Neretva Canton and West Herzegovina Canton, main roads:

  • M17.5 Jablanica – Blidinje - Posušje_Grude - Privalj, L= 100,775 km

LOT 13 total length: 100,775 km,
Contractor: JV „Putovi“ Grude, „Brina“ Posušje, „HP Investing“ Mostar (Commencement Date 1 February 2020), Address: Cerov Dolac bb 88 347 Ružići, Grude, phone: +387 39 674 403;

LOT 14, Una – Sana Canton, main roads:

  • M4.3 Velika Kladuša – Bužim - Bosanska Otoka, L= 57,00 km;

LOT 14 total length: 57, 00 km,
Contractor: „Kov-grad“ Bužim (Commencement Date 15 November 2019), Address: Mrazovac 326, 77 245 Bužim, phone: +387 37 423-320;